Design & Build: Mendoza 270
Construction on this Modern Mexican stunner began in spring 2012 despite the challenges of rocky foundational terrain and rainy weather. The completed home features 3 levels with 5 bedrooms and 5 baths, with the upper levels boasting exquisite views of the pastoral hills all around. An open floorplan and interior garage add to the charm of this home.
The supporting structure is made entirely of metal with a spacious roofdeck made of concrete thicker and more structurally sound than required by international codes.
Front door
|
Main entrance 2
|
2nd floor view
|
Carpentry (closets)
|
Front exterior
|
Front door 2
|
Front door detail
|
Exterior stucco July
|
Bar
|
Kitchen
|
Closets
|
Main entrance
|
Main hallway
|
Lighting
|
Blue bathroom
|
Interior stairs
|
1st floor doors
|
Garage stairs
|
Master bath
|
Main bath ceramic
|
Rubber bitumen roof 2
|
Tile work
|
Bath tiling
|
Rubber bitumen roof
|
Exterior stucco
|
Stucco 1
|
2nd floor doors
|
Interior carpentry
|
Stucco 2
|
Exterior finishing
|
Door frame
|
Exterior stucco 3
|
Structural post painting
|
Exterior stucco 2
|
Balcony
|
Main level electrical finishing
|
Stairwell
|
Kitchen electrical finishes
|
Living room
|
Master bedroom electrical finishing
|
Interior drywall in progress
|
TV room and studio electrical finishing
|
Interior Painting
|
Windows and exterior work
|
Interior Hall Painting
|
Front view
|
exterior work
|
Waterproofing
|
Interior Painting 2
|
Front image
|
Three level view
|
Corner view
|
Exterior with window
|
Side view
|
Interior drywall
|
Roof
|
Ceiling
|
Drywall
|
Scaffolding
|
Garage 2
|
Concrete and steel
|
Utility room 2
|
Vista Zotano
|
Armado Estructural
|
Framing
|
Interiors
|
Framing 4
|
elevations
|
Armado Estructural Detallado
|
2do Nivel: Instalacion de Metal
|
Rebar work
|
Steel structure
|
Steel structure 2
|
Equipment during demo
|
Framing 2
|
Framing 3
|
Soldering
|
Basement
|
Concrete
|
Garage
|
1st Floor
|
Steel supports
|
Utility room
|
Exterior July
|
Custom kitchen
|
Steps
|
Front
|
Kitchen 2
|
Kitchen 3
|
Bathroom
|
Bathroom 2
|
Carpentry (kitchen)
|
Flooring Aug 2013
|
Tile work balcony
|
Kitchen work
|
Stucco 3
|